---
description: Hive : qu'en pensent les utilisateurs ? Lisez les avis clients sur Hive, consultez les prix, tarifs, abonnements et découvrez ses fonctionnalités grâce à Capterra Luxembourg.
image: https://gdm-localsites-assets-gfprod.imgix.net/images/capterra/og_logo-e5a8c001ed0bd1bb922639230fcea71a.png?auto=format%2Cenhance%2Ccompress
title: Hive - Avis, notes, prix et abonnements - Capterra Luxembourg 2026
---

Breadcrumb: [Accueil](/) > [Gestion de projets](/directory/30002/project-management/software) > [Hive](/software/150991/hive)

# Hive

Canonical: https://www.capterra.lu/software/150991/hive

Page : 1/10\
Suivant: [Page suivante](https://www.capterra.lu/software/150991/hive?page=2)

> Puissante plateforme de gestion de projet et de collaboration
> 
> Conclusion : 220 utilisateurs lui ont donné la note de **4.4/5**. Figure au meilleur classement pour **Probabilité de recommander le produit**.

-----

## Présentation

### Qui utilise Hive ?

Hive est utilisé par des milliers d'agences et de marques qui s'appuient sur ce logiciel collaboratif de gestion de projet pour accélérer leurs opérations.

## Statistiques et notes

| Métrique | Notation | En détail |
| **Note globale** | **4.4/5** | 220 Avis |
| Simplicité | 4.4/5 | D'après l'ensemble des avis |
| Support client | 4.5/5 | D'après l'ensemble des avis |
| Rapport qualité-prix | 4.4/5 | D'après l'ensemble des avis |
|  Fonctionnalités | 4.3/5 | D'après l'ensemble des avis |
| Pourcentage de recommandation | 80% | (8/10 Probabilité de recommander le produit) |

## À propos de l'éditeur

- **Société**: Hive

## Contexte commercial

- **À partir de**: 0,00 $US
- **Type de licence**:  (Version gratuite disponible) (Essai gratuit)
- **Public cible**: 2–10, 11–50, 51–200, 201–500, 501–1.000, 1.001–5.000, 5.001–10.000, 10.000+
- **Déploiement et plateformes**: Cloud, SaaS, web
- **Langues**: anglais
- **Pays disponibles**: Afghanistan, Afrique du Sud, Albanie, Algérie, Allemagne, Andorre, Angola, Anguilla, Antigua-et-Barbuda, Arabie saoudite, Argentine, Arménie, Aruba, Australie, Autriche, Azerbaïdjan, Bahamas, Bahreïn, Bangladesh, Barbade et 185 de plus

##  Fonctionnalités

- Alertes/Notifications
- Annotations
- Automated Text Generation
- Automatisation des processus métiers
- Base de données des employés
- Budgétisation et prévision
- Chat et messagerie
- Configuration des workflows
- Contrôle du processus d'approbation
- Correcteur grammatical
- Création et conception de formulaires
- Définition des priorités
- Examen de documents
- Gestion de projets
- Gestion de versions
- Gestion des activités commerciales
- Gestion des calendriers
- Gestion des contacts
- Gestion des feuilles de temps
- Gestion des leads
- Gestion des notes
- Gestion des objectifs
- Gestion des tâches
- Intelligence artificielle et machine learning
- Intelligence conversationnelle
- Logiciels d'expérience client
- Notes de réunions
- Outils de collaboration
- Planification d'activités
- Planification du personnel
- Planification et programmation de projets
- Planification stratégique
- Pour organisations et équipes commerciales
- ROI Tracking
- Rapports et analyses
- Real-Time Reporting
- Real-Time Updates
- Reporting et suivi de projet
- Saisie de données
- Sprint planning
- Suivi de l'engagement
- Suivi de la progression
- Suivi des indicateurs clés de performance
- Suivi des interactions
- Suivi des projets
- Suivi des vacances/congés
- Suivi du temps
- Suivi du temps des projets
- Task Editing
- Vérification orthographique

... et 82 fonctionnalités supplémentaires

## Intégrations (24 au total)

- ActiveCampaign
- Box
- Bynder
- Dropbox
- FreshBooks
- Freshdesk
- GitHub
- Gong
- Harvest
- HubSpot Marketing Hub
- Jira
- Marketo Engage
- Microsoft Outlook
- Microsoft Teams
- OneDrive

... et 9 intégrations supplémentaires

## Ressources d'aide

- Service client/e-mail
- FAQ/forums
- Base de connaissances
- Support téléphonique
- Support 24/7 (réponse directe)
- Chat

## Category

- [Gestion de projets](https://www.capterra.lu/directory/30002/project-management/software)

## Catégories connexes

- [Gestion de projets](https://www.capterra.lu/directory/30002/project-management/software)
- [Outils collaboratifs](https://www.capterra.lu/directory/15/collaboration/software)
- [Gestion des flux de travail](https://www.capterra.lu/directory/30091/workflow-management/software)
- [Outils de gestion de projet agile](https://www.capterra.lu/directory/31556/agile-project-management-tools/software)
- [Outils Kanban](https://www.capterra.lu/directory/31580/kanban-tools/software)

##  Logiciels similaires

1. [Asana](https://www.capterra.lu/software/120550/asana-pm) — 4.5/5 (13778 reviews)
2. [Jira](https://www.capterra.lu/software/19319/jira) — 4.4/5 (15781 reviews)
3. [monday AI Workspace](https://www.capterra.lu/software/147657/monday-com) — 4.6/5 (6134 reviews)
4. [Trello](https://www.capterra.lu/software/1010321/trello) — 4.5/5 (23647 reviews)
5. [Clockify](https://www.capterra.lu/software/169607/clockify) — 4.8/5 (9276 reviews)

## Avis

### "The project management product we were looking for" — 4.0/5

> **Stephen Brent** | *19 mars 2020* | Marketing et publicité | Taux de recommandation : 9.0/10
> 
> **Avantages**: We looked at and tested several project management options and had used several in the past. Hive was never on our radar and unfortunately isn't as well known, but we discovered it through the WeWork employee portal and gave it a try. The set up was simple, it offered flexibility in terms of how you view and sort projects. It also allowed us to add external users without paying for a seat. This was extremely important because we want our clients to have access to our project boards, but we don't need full functionality for them.&#10;&#10;While it wasn't available when we first started using it, the addition of time tracking was a huge bonus for us as an agency, and Hive continues to impress us by adding additional features and functionality. When it comes to support, they are extremely responsive and in the rare times we have had to utilize support, issues have been resolved to satusfaction.
> 
> **Inconvénients**: I wish there was a native integration with HubSpot, but we're able to get around that with Zapier.

-----

### "The best project management software" — 5.0/5

> **Tichaona Redemptor** | *22 février 2024* | Services et technologies de l'information | Taux de recommandation : 6.0/10
> 
> **Avantages**: It has a smart analytics feature that allows users to track their progress, performance, and productivity, and get insights and recommendations from machine learning.
> 
> **Inconvénients**: The task dependencies feature is not available or not working properly. Users cannot create dependent tasks or link tasks to each other.
> 
> I think Hive is a great project management tool that offers many features and benefits for users.

-----

### "A potentially powerful tool crippled by poor and inconsistent UI" — 2.0/5

> **Matt** | *29 juin 2024* | Design | Taux de recommandation : 2.0/10
> 
> **Avantages**: They have a very good support team and the project gantt charts are useful.
> 
> **Inconvénients**: The UI is unbelievably poorly designed with lots of inconsistencies and everything takes more clicks and time than it should. It is incredibly inaccessible for the neurodiverse because of it's poor design. It takes a long time to learn and is quite glitchy. I frequently encounter problems and it is difficult to work out whether each problem is due to a Hive glitch or a user error because of the poor UI. It's a total time sink and makes me want to quit my job.
> 
> An unmitigated horror story of misery and despair. Completely unsuitable for managing multiple complex jobs with many moving parts. A very poor piece of software for granular time management. It has lots of potentially good features but they are all so badly and confusingly designed. It could potentially be very useful and powerful but they need to completely revamp their UI design philosophy to make it easy and consistent. It feels very outdated and not well joined up.

-----

### "Ideal for cooperation on internal and external projects" — 4.0/5

> **Brandon** | *11 septembre 2023* | Hôpitaux et soins de santé | Taux de recommandation : 8.0/10
> 
> **Avantages**: It's incredibly straightforward, yet packed with flexible features. handling projects as a manager. Assigning work to team members, keeping tabs on their progress, etc.
> 
> **Inconvénients**: The only drawback thus far is the cost. Although it is not the cheapest service we have used, it has everything we need to keep our projects on schedule and working smoothly.
> 
> Team members should be able to talk to each other right away. As a company, we rely heavily on phone contacts with consumers, therefore when problems arise, staff members need to be able to get down to the bottom of things without having to start another call. While on the phone with a customer, we may effortlessly converse thanks to this service.

-----

### "Communication, Deadlines and Task assignments" — 4.0/5

> **Courtney** | *26 décembre 2022* | Services et technologies de l'information | Taux de recommandation : 9.0/10
> 
> **Avantages**: It was a helpful resource for organizing our work. The platform's emphasis on its users contributes to its widespread popularity and adaptability. Low-code form and automation possibilities on a fantastic platform for streamlining our operations. However, reporting at the corporate level has received scant consideration.
> 
> **Inconvénients**: There's room for improvement in the price system. For instance, regardless of the size of your team, you're limited to 500 automations, regardless of how many seats you buy. The gap between one level of service and the next is fairly wide, making the decision to upgrade a major one.
> 
> It's a useful tool for keeping track of everything you have to do. A fantastic platform that prioritizes its users by offering low-code alternatives for constructing automated forms and other labor-saving features. More people will use the software, and it will be more adaptable.

-----

Page : 1/10\
Suivant: [Page suivante](https://www.capterra.lu/software/150991/hive?page=2)

## Liens

- [Afficher sur Capterra](https://www.capterra.lu/software/150991/hive)

## Cette page est disponible dans les langues suivantes.

| Langue | URL |
| de | <https://www.capterra.com.de/software/150991/hive> |
| de-AT | <https://www.capterra.at/software/150991/hive> |
| de-CH | <https://www.capterra.ch/software/150991/hive> |
| en | <https://www.capterra.com/p/150991/Hive/> |
| en-AE | <https://www.capterra.ae/software/150991/hive> |
| en-AU | <https://www.capterra.com.au/software/150991/hive> |
| en-CA | <https://www.capterra.ca/software/150991/hive> |
| en-GB | <https://www.capterra.co.uk/software/150991/hive> |
| en-IE | <https://www.capterra.ie/software/150991/hive> |
| en-IL | <https://www.capterra.co.il/software/150991/hive> |
| en-IN | <https://www.capterra.in/software/150991/hive> |
| en-NZ | <https://www.capterra.co.nz/software/150991/hive> |
| en-SG | <https://www.capterra.com.sg/software/150991/hive> |
| en-ZA | <https://www.capterra.co.za/software/150991/hive> |
| es | <https://www.capterra.es/software/150991/hive> |
| es-AR | <https://www.capterra.com.ar/software/150991/hive> |
| es-CL | <https://www.capterra.cl/software/150991/hive> |
| es-CO | <https://www.capterra.co/software/150991/hive> |
| es-CR | <https://www.capterra.co.cr/software/150991/hive> |
| es-DO | <https://www.capterra.do/software/150991/hive> |
| es-EC | <https://www.capterra.ec/software/150991/hive> |
| es-MX | <https://www.capterra.mx/software/150991/hive> |
| es-PA | <https://www.capterra.com.pa/software/150991/hive> |
| es-PE | <https://www.capterra.pe/software/150991/hive> |
| fr | <https://www.capterra.fr/software/150991/hive> |
| fr-BE | <https://fr.capterra.be/software/150991/hive> |
| fr-CA | <https://fr.capterra.ca/software/150991/hive> |
| fr-LU | <https://www.capterra.lu/software/150991/hive> |
| it | <https://www.capterra.it/software/150991/hive> |
| nl | <https://www.capterra.nl/software/150991/hive> |
| nl-BE | <https://www.capterra.be/software/150991/hive> |
| pt | <https://www.capterra.com.br/software/150991/hive> |
| pt-PT | <https://www.capterra.pt/software/150991/hive> |

-----

## Données structurées

<script type="application/ld+json">
  {"@context":"https://schema.org","@graph":[{"name":null,"address":{"@type":"PostalAddress","addressLocality":null,"addressRegion":null,"postalCode":null,"streetAddress":null},"description":"Capterra Luxembourg aide des millions de professionnels à trouver le bon logiciel. Découvrez les avis, les notes et les listes exhaustives d'outils informatiques.","email":"info@capterra.lu","url":"https://www.capterra.lu/","logo":"https://dm-localsites-assets-prod.imgix.net/images/capterra/logo-a9b3b18653bd44e574e5108c22ab4d3c.svg","@id":"https://www.capterra.lu/#organization","@type":"Organization","parentOrganization":"G2.com, Inc.","sameAs":["https://twitter.com/capterra","https://www.facebook.com/Capterra/","https://www.linkedin.com/company/capterra","https://www.instagram.com/capterra/","https://www.youtube.com/user/CapterraTV"]},{"name":"Hive","description":"Hive est l'outil de gestion de projet qui appuie les équipes ultraperformantes chez Uber, Google, Starbucks, Essence, etc. Hive se dévoue à aider les équipes à agir plus rapidement et à améliorer l'efficacité des processus à l'échelle de l'entreprise.\n\nAvec des mises en page de projet flexibles, une messagerie native, des ressources, une messagerie de groupe et le partage de fichiers, Hive connecte tous les aspects de votre travail.","image":"https://images.g2crowd.com/display-layer-screenshots/27036/a1bce54b-f7e8-43ef-9da9-fabf7fbb7b73-hive-kanban-buzz.png","url":"https://www.capterra.lu/software/150991/hive","@id":"https://www.capterra.lu/software/150991/hive#software","@type":"SoftwareApplication","applicationCategory":"BusinessApplication","publisher":{"@id":"https://www.capterra.lu/#organization"},"aggregateRating":{"@type":"AggregateRating","bestRating":5,"ratingCount":220,"ratingValue":4.4},"offers":{"price":"0","@type":"Offer","priceCurrency":"USD"},"operatingSystem":"Cloud"},{"@id":"https://www.capterra.lu/software/150991/hive#faqs","@type":"FAQPage","mainEntity":[{"name":"Qui utilise Hive ?","@type":"Question","acceptedAnswer":{"text":"Hive est utilisé par des milliers d'agences et de marques qui s'appuient sur ce logiciel collaboratif de gestion de projet pour accélérer leurs opérations.","@type":"Answer"}}]},{"@id":"https://www.capterra.lu/software/150991/hive#breadcrumblist","@type":"BreadcrumbList","itemListElement":[{"name":"Accueil","position":1,"item":"/","@type":"ListItem"},{"name":"Gestion de projets","position":2,"item":"/directory/30002/project-management/software","@type":"ListItem"},{"name":"Hive","position":3,"item":"/software/150991/hive","@type":"ListItem"}]}]}
</script>
