---
description: Camms.Project : qu'en pensent les utilisateurs ? Lisez les avis clients sur Camms.Project, consultez les prix, tarifs, abonnements et découvrez ses fonctionnalités grâce à Capterra Luxembourg.
image: https://gdm-localsites-assets-gfprod.imgix.net/images/capterra/og_logo-e5a8c001ed0bd1bb922639230fcea71a.png?auto=format%2Cenhance%2Ccompress
title: Camms.Project - Avis, notes, prix et abonnements - Capterra Luxembourg 2026
---

Breadcrumb: [Accueil](/) > [Gestion de projets](/directory/30002/project-management/software) > [Camms.Project](/software/156366/cammsproject)

# Camms.Project

Canonical: https://www.capterra.lu/software/156366/cammsproject

Page : 1/4\
Suivant: [Page suivante](https://www.capterra.lu/software/156366/cammsproject?page=2)

> Gérez tous les besoins de votre organisation en matière de gestion de projet dans un système flexible et facile à utiliser.
> 
> Conclusion : 59 utilisateurs lui ont donné la note de **4.6/5**. Figure au meilleur classement pour **Probabilité de recommander le produit**.

-----

## Présentation

### Qui utilise Camms.Project ?

Les flux de travail flexibles signifient que cammsproject s'adresse aux organisations de toutes tailles, à la recherche d'un système facile à utiliser qui accorde de l'attention aux détails.

## Statistiques et notes

| Métrique | Notation | En détail |
| **Note globale** | **4.6/5** | 59 Avis |
| Simplicité | 4.5/5 | D'après l'ensemble des avis |
| Support client | 4.6/5 | D'après l'ensemble des avis |
| Rapport qualité-prix | 4.6/5 | D'après l'ensemble des avis |
|  Fonctionnalités | 4.5/5 | D'après l'ensemble des avis |
| Pourcentage de recommandation | 90% | (9/10 Probabilité de recommander le produit) |

## À propos de l'éditeur

- **Société**: Riskonnect
- **Pays**: Kennesaw, É.-U.
- **Entreprise fondée en**: 2007

## Contexte commercial

- **À partir de**: 15,00 $US
- **Public cible**: 2–10, 11–50, 51–200, 201–500, 501–1.000, 1.001–5.000, 5.001–10.000, 10.000+
- **Déploiement et plateformes**: Cloud, SaaS, web, Windows (sur site), Linux (sur site)
- **Langues**: anglais
- **Pays disponibles**: Australie, Canada, Nouvelle-Zélande, Royaume-Uni, États-Unis

##  Fonctionnalités

- Accès mobile
- Aperçu de Gantt/du calendrier
- Base de données de sous-traitants
- Budgétisation et prévision
- Définition des priorités
- Facturation
- Gestion de la conformité
- Gestion des changements
- Gestion des documents
- Gestion des flux de travail
- Gestion des portefeuilles
- Gestion des problèmes
- Gestion des ressources
- Gestion des tâches
- Gestion des tâches
- Gestion du budget
- Modèles personnalisables
- Outils de collaboration
- Partage des fichiers
- Planification de projets
- Planification et programmation de projets
- Projets multiples
- Rapports et analyses
- Reporting et suivi de projet
- Suivi de la progression
- Suivi des projets
- Suivi des étapes
- Suivi du temps et des dépenses
- Tableau de bord
- Tableau de bord d'activités

## Ressources d'aide

- Service client/e-mail
- Support téléphonique
- Chat

## Category

- [Gestion de projets](https://www.capterra.lu/directory/30002/project-management/software)

## Catégories connexes

- [Gestion de projets](https://www.capterra.lu/directory/30002/project-management/software)
- [Gestion des sous-traitants](https://www.capterra.lu/directory/30853/contractor-management/software)
- [Logiciels de gestion de portefeuille de projets](https://www.capterra.lu/directory/30862/project-portfolio-management/software)
- [Logiciels de gestion de projet à but non lucratif](https://www.capterra.lu/directory/32439/project-management-software-for-nonprofits/software)

##  Logiciels similaires

1. [Jira](https://www.capterra.lu/software/19319/jira) — 4.4/5 (15781 reviews)
2. [Visual Planning](https://www.capterra.lu/software/91852/visual-planning) — 4.5/5 (128 reviews)
3. [Wrike](https://www.capterra.lu/software/76113/wrike) — 4.4/5 (3045 reviews)
4. [Trello](https://www.capterra.lu/software/1010321/trello) — 4.5/5 (23647 reviews)
5. [ClickUp](https://www.capterra.lu/software/158833/clickup) — 4.6/5 (4645 reviews)

## Avis

### "flexible project management software" — 5.0/5

> **wayne** | *14 février 2017* | Administration publique | Taux de recommandation : 10.0/10
> 
> **Avantages**: ability to customise all pages
> 
> **Inconvénients**: flexibilty can mean creting complexity for end user&#13;&#10;not a software issue&#13;&#10;k
> 
> camms project management software is highly configurable to meet any organisations project management framework&#13;&#10;an organisation can change all terminilogy using simple administration tools&#13;&#10;all types of projects can be created in a single database and the level of information required can be tailored to suite the value or complxity of each project&#13;&#10;there are a wide variety of report outputs however custom reports can be creted and added to the reports menu&#13;&#10;whole of life income and costs can be recorded for all projects gretly e&#13;&#10;nhancing business planning and long term financial planningk

-----

### "Projects delivered on time\!" — 5.0/5

> **Athina** | *15 février 2017* | Marketing et publicité | Taux de recommandation : 10.0/10
> 
> **Avantages**: It is reliable\! logical in the way it has been set up and required very little training. The functionality is very advanced and there is so much more we can still do with the software.
> 
> **Inconvénients**: n/a
> 
> We were struggling to deliver projects on time due to our workload and because we had no clear process and sight of who was undertaking specific tasks. Cammsproject allowed Minverva as an organisation to implement our PMO methodology into the system which meant staff understood the steps required for all of our projects. The tasks assigned to individuals and the sight staff have of these responsibilities has in my eyes resulted in projects being delivered on time even during our busy schedule. The Project Hub area is where I spend a great deal of time reviewing all projects and inputting updates, this is clear and logical. The dashboards, reports and portfolio view also allow for detailed analysis to take place which has been hugely beneficial during team meetings/board meetings etc.

-----

### "It is a good tool; however it lacks certain function to manage programs of work and collaboration." — 3.0/5

> **Juan** | *9 août 2017* | Administration publique | Taux de recommandation : 5.0/10
> 
> **Avantages**: It links easily to our corporation's performance management system which permits reporting from project to relevant strategic and operational plan.  Likewise, the technical customer support is very strong.
> 
> **Inconvénients**: It does not easily lend itself to manage programs of work composed of many child projects without additional costs.  Likewise, it is temperamental in how it behaves which requires customer support.
> 
> At this point, I do not believe we have gained the benefits we had anticipated from the software.  However, it is a combination of both some technical limitations of the tool and adoption within the organization.  We were not as clear to the purpose of the tool and therefore staff were unsure how and when to use.

-----

### "Faster and more streamlined, visually appealing" — 4.0/5

> **Dani** | *9 août 2017* | Administration publique | Taux de recommandation : 8.0/10
> 
> **Avantages**: The first item that stood out to me is the new style of quick updates from the home page and in the project hub in cammsproject. It is visually pleasing and easy to use, providing users with a simple way to provide current progress on projects and project tasks.&#13;&#10;New project register is equally pleasing.&#13;&#10;The general visual appearance is more open and giving the impression of space.&#13;&#10;&#13;&#10;Cammsproject is faster and runs smoother than the previous project module. When editing an object table, it is now easy to see which cell you are updating (previously this was very difficult and a cause of confusion for customers)&#13;&#10;&#13;&#10;The new project risk objects that link to the risk module have significantly improved in the layout. Where previously cramped, it is now open and easy to edit.&#13;&#10;&#13;&#10;The new version of the project schedule loads in both IE and chrome. The new design is visually appealing and
> 
> **Inconvénients**: Familiarising self with the new layout of items and learning what each icon was over reading a text menu took some time. It was a particular struggle to find administrative functions and individual project stages. This would not be an issue for anyone changing between the old project module and the new cammsproject.&#10;&#10;Reports need further development, both in relation to the filters/parameters and the visuals of the report themselves.&#10;&#10;As an admin, it was difficult to adjust to the new layout of administrative functions.
> 
> Improved consistent project management and tracking thereof

-----

### "Perfect for Managing Projects at Convex Capital\!" — 5.0/5

> **David** | *15 février 2017* | Services financiers | Taux de recommandation : 10.0/10
> 
> **Avantages**: Interface, Workflows that can be created, customisation, chat feature, gannt chart. It has everything needed to manage projects effectively but still allowing flexibility when needed within a fast paced industry.
> 
> **Inconvénients**: None come to mind.
> 
> We were struggling to ensure any proper governance for all of our projects while also allowing staff to remain flexible when undertaking a variety of projects. Cammsproject allowed us to create workflows for the different project types that we manage which we found very unique within the market. Governance was appropriately manged through the sign offs and the ease of use has meant projects are now being delivered more efficiently. The interface is slick, modern and encourages user adoption. The reports are very detailed and we have been able to filter the key areas to allow the information needed to be displayed. Great product, company and would definitely recommend.

-----

Page : 1/4\
Suivant: [Page suivante](https://www.capterra.lu/software/156366/cammsproject?page=2)

## Liens

- [Afficher sur Capterra](https://www.capterra.lu/software/156366/cammsproject)

## Cette page est disponible dans les langues suivantes.

| Langue | URL |
| de | <https://www.capterra.com.de/software/156366/cammsproject> |
| de-AT | <https://www.capterra.at/software/156366/cammsproject> |
| de-CH | <https://www.capterra.ch/software/156366/cammsproject> |
| en | <https://www.capterra.com/p/156366/cammsproject/> |
| en-AE | <https://www.capterra.ae/software/156366/cammsproject> |
| en-AU | <https://www.capterra.com.au/software/156366/cammsproject> |
| en-CA | <https://www.capterra.ca/software/156366/cammsproject> |
| en-GB | <https://www.capterra.co.uk/software/156366/cammsproject> |
| en-IE | <https://www.capterra.ie/software/156366/cammsproject> |
| en-IL | <https://www.capterra.co.il/software/156366/cammsproject> |
| en-IN | <https://www.capterra.in/software/156366/cammsproject> |
| en-NZ | <https://www.capterra.co.nz/software/156366/cammsproject> |
| en-SG | <https://www.capterra.com.sg/software/156366/cammsproject> |
| en-ZA | <https://www.capterra.co.za/software/156366/cammsproject> |
| es | <https://www.capterra.es/software/156366/cammsproject> |
| es-AR | <https://www.capterra.com.ar/software/156366/cammsproject> |
| es-CL | <https://www.capterra.cl/software/156366/cammsproject> |
| es-CO | <https://www.capterra.co/software/156366/cammsproject> |
| es-CR | <https://www.capterra.co.cr/software/156366/cammsproject> |
| es-DO | <https://www.capterra.do/software/156366/cammsproject> |
| es-EC | <https://www.capterra.ec/software/156366/cammsproject> |
| es-MX | <https://www.capterra.mx/software/156366/cammsproject> |
| es-PA | <https://www.capterra.com.pa/software/156366/cammsproject> |
| es-PE | <https://www.capterra.pe/software/156366/cammsproject> |
| fr | <https://www.capterra.fr/software/156366/cammsproject> |
| fr-BE | <https://fr.capterra.be/software/156366/cammsproject> |
| fr-CA | <https://fr.capterra.ca/software/156366/cammsproject> |
| fr-LU | <https://www.capterra.lu/software/156366/cammsproject> |
| it | <https://www.capterra.it/software/156366/cammsproject> |
| nl | <https://www.capterra.nl/software/156366/cammsproject> |
| nl-BE | <https://www.capterra.be/software/156366/cammsproject> |
| pt | <https://www.capterra.com.br/software/156366/cammsproject> |
| pt-PT | <https://www.capterra.pt/software/156366/cammsproject> |

-----

## Données structurées

<script type="application/ld+json">
  {"@context":"https://schema.org","@graph":[{"name":null,"address":{"@type":"PostalAddress","addressLocality":null,"addressRegion":null,"postalCode":null,"streetAddress":null},"description":"Capterra Luxembourg aide des millions de professionnels à trouver le bon logiciel. Découvrez les avis, les notes et les listes exhaustives d'outils informatiques.","email":"info@capterra.lu","url":"https://www.capterra.lu/","logo":"https://dm-localsites-assets-prod.imgix.net/images/capterra/logo-a9b3b18653bd44e574e5108c22ab4d3c.svg","@id":"https://www.capterra.lu/#organization","@type":"Organization","parentOrganization":"G2.com, Inc.","sameAs":["https://twitter.com/capterra","https://www.facebook.com/Capterra/","https://www.linkedin.com/company/capterra","https://www.instagram.com/capterra/","https://www.youtube.com/user/CapterraTV"]},{"name":"Camms.Project","description":"Bienvenue dans cammsproject, le moyen facile de gérer des projets et des portefeuilles sur le cloud. L'éditeur propose un produit simple, avec une interface utilisateur élégante, des flux de travail et des modèles flexibles et des tableaux de bord faciles à lire. Gagnez du temps en classant des projets, en assignant des tâches et en allouant des ressources dans un seul système. Et réduisez le nombre d'e-mails et de réunions en communiquant avec votre équipe via le Hub. De plus, les applications iOS et Android vous permettent d'accéder aux données de votre organisation partout et à tout moment. Quatre niveaux de tarification disponibles.","image":"https://gdm-catalog-fmapi-prod.imgix.net/ProductScreenshot/348269d1-bba6-41b0-abe7-71db70708540.png","url":"https://www.capterra.lu/software/156366/cammsproject","@id":"https://www.capterra.lu/software/156366/cammsproject#software","@type":"SoftwareApplication","applicationCategory":"BusinessApplication","publisher":{"@id":"https://www.capterra.lu/#organization"},"aggregateRating":{"@type":"AggregateRating","bestRating":5,"ratingCount":59,"ratingValue":4.6},"offers":{"price":"15","@type":"Offer","priceCurrency":"USD"},"operatingSystem":"Cloud, Windows on premise, Linux on premise"},{"@id":"https://www.capterra.lu/software/156366/cammsproject#faqs","@type":"FAQPage","mainEntity":[{"name":"Qui utilise Camms.Project ?","@type":"Question","acceptedAnswer":{"text":"Les flux de travail flexibles signifient que cammsproject s'adresse aux organisations de toutes tailles, à la recherche d'un système facile à utiliser qui accorde de l'attention aux détails.","@type":"Answer"}}]},{"@id":"https://www.capterra.lu/software/156366/cammsproject#breadcrumblist","@type":"BreadcrumbList","itemListElement":[{"name":"Accueil","position":1,"item":"/","@type":"ListItem"},{"name":"Gestion de projets","position":2,"item":"/directory/30002/project-management/software","@type":"ListItem"},{"name":"Camms.Project","position":3,"item":"/software/156366/cammsproject","@type":"ListItem"}]}]}
</script>
