---
description: Oracle Primavera Cloud : qu'en pensent les utilisateurs ? Lisez les avis clients sur Oracle Primavera Cloud, consultez les prix, tarifs, abonnements et découvrez ses fonctionnalités grâce à Capterra Luxembourg.
image: https://gdm-localsites-assets-gfprod.imgix.net/images/capterra/og_logo-e5a8c001ed0bd1bb922639230fcea71a.png?auto=format%2Cenhance%2Ccompress
title: Oracle Primavera Cloud - Avis, notes, prix et abonnements - Capterra Luxembourg 2026
---

Breadcrumb: [Accueil](/) > [Logiciels de construction](/directory/30057/construction-management/software) > [Oracle Primavera Cloud](/software/181380/oracle-primavera)

# Oracle Primavera Cloud

Canonical: https://www.capterra.lu/software/181380/oracle-primavera

Page : 1/9\
Suivant: [Page suivante](https://www.capterra.lu/software/181380/oracle-primavera?page=2)

> Oracle Primavera est la solution la plus puissante, la plus robuste et la plus simple à utiliser pour la planification, la gestion et l'exécution de projets de toutes tailles.
> 
> Conclusion : 182 utilisateurs lui ont donné la note de **4.4/5**. Figure au meilleur classement pour **Probabilité de recommander le produit**.

-----

## Présentation

### Qui utilise Oracle Primavera Cloud ?

Les secteurs de l'ingénierie et de la construction,&#10;de l'énergie et des ressources,&#10;le secteur public.&#10;Manufacture

## Statistiques et notes

| Métrique | Notation | En détail |
| **Note globale** | **4.4/5** | 182 Avis |
| Simplicité | 3.7/5 | D'après l'ensemble des avis |
| Support client | 4.0/5 | D'après l'ensemble des avis |
| Rapport qualité-prix | 4.0/5 | D'après l'ensemble des avis |
|  Fonctionnalités | 4.4/5 | D'après l'ensemble des avis |
| Pourcentage de recommandation | 80% | (8/10 Probabilité de recommander le produit) |

## À propos de l'éditeur

- **Société**: Oracle
- **Pays**: Chicago, É.-U.
- **Entreprise fondée en**: 1977

## Contexte commercial

- **À partir de**: 100,00 $US
- **Public cible**: Auto-entrepreneur, 2–10, 11–50, 51–200, 201–500, 501–1.000, 1.001–5.000, 5.001–10.000, 10.000+
- **Déploiement et plateformes**: Cloud, SaaS, web, Windows (sur site), Linux (sur site)
- **Langues**: allemand, anglais, chinois, chinois traditionnel, coréen, espagnol, français, italien, japonais, néerlandais, portugais, russe
- **Pays disponibles**: Allemagne, Australie, Canada, Royaume-Uni, États-Unis

##  Fonctionnalités

- Accès mobile
- Aperçu de Gantt/du calendrier
- Budget Tracking
- Calendrier du personnel
- Définition des priorités
- Estimation des coûts
- Gestion des capacités
- Gestion des documents
- Gestion des feuilles de temps
- Gestion des offres
- Gestion des ordres de changement
- Gestion des tâches
- Outils de collaboration
- Planification
- Planification de projet
- Planification de projets
- Planification des ressources
- Planification des tâches
- Projets multiples
- Rapports de suivi
- Suivi des compétences
- Suivi des projets
- Suivi du temps
- Tableau de bord

## Intégrations (6 au total)

- Assignar
- Oracle Aconex
- Primavera Unifier
- Primavera Unifier Accelerator
- Reconstruct
- Zapier

## Ressources d'aide

- FAQ/forums
- Support téléphonique
- Support 24/7 (réponse directe)
- Chat

## Category

- [Logiciels de construction](https://www.capterra.lu/directory/30057/construction-management/software)

## Catégories connexes

- [Logiciels de construction](https://www.capterra.lu/directory/30057/construction-management/software)
- [Logiciels de planning chantier](https://www.capterra.lu/directory/31522/construction-scheduling/software)
- [Logiciels de gestion de portefeuille de projets](https://www.capterra.lu/directory/30862/project-portfolio-management/software)
- [Logiciels de gestion immobilière](https://www.capterra.lu/directory/20050/real-estate-property-management/software)
- [Other Construction Software](https://www.capterra.lu/directory/34536/other-construction/software)

##  Logiciels similaires

1. [Procore](https://www.capterra.lu/software/56250/procore) — 4.5/5 (2680 reviews)
2. [Smartsheet](https://www.capterra.lu/software/79104/smartsheet) — 4.5/5 (3579 reviews)
3. [monday AI Workspace](https://www.capterra.lu/software/147657/monday-com) — 4.6/5 (6134 reviews)
4. [Buildertrend](https://www.capterra.lu/software/70092/buildertrend) — 4.5/5 (2489 reviews)
5. [Visual Planning](https://www.capterra.lu/software/91852/visual-planning) — 4.5/5 (128 reviews)

## Avis

### "Market leader scheduling and planning software" — 5.0/5

> **Amjad** | *23 octobre 2019* | Secteur maritime | Taux de recommandation : 8.0/10
> 
> **Avantages**: - has everything required for project scheduling using critical path method (WBS, activities, cost and resource loading)&#10;- Global change offers an unbelievably powerful solution to change thousands of activities on the fly.&#10;- Can handle very large schedules that include tens of thousands of activities at ease.&#10;- Works using databases rather than project files which makes it suitable for working on many projects and offers many types of databases (Oracle, SQL server, SQLite)&#10;- supports single or multiple users&#10;- now has the EPPM version which is cloud-based and has improved immensely over the years
> 
> **Inconvénients**: - It shines for large and complex projects, for smaller and simpler schedules it tends to be more cumbersome.&#10;- It requires a very good understanding of how the software and CPM work when analysing results. Otherwise; mistakes can be done easily&#10;- While powerfull, the reporting feature of the Pro version (Standalone) looks antiquated in comparison to the EPPM cloud version. &#10;- The standalone version has not received any important feature updates for years.&#10;- Lacks the seamless integration with MS Office that MS Project has&#10;- Requires IT assistance to migrate the database from one computer to another
> 
> It was my daily driver for years and despite the steep learning curve, it was an extremely capable tool.

-----

### "Excellent Project Tracking and Accounting Options are Effective." — 5.0/5

> **Hannah** | *11 juillet 2023* | Logiciels de construction | Taux de recommandation : 9.0/10
> 
> **Avantages**: The support on various Accounting platform integration and the stability of it's Mobile Access is amazing and the project document management this Oracle solution is the best choice.
> 
> **Inconvénients**: Easy customization of various features on this Oracle product and I never experienced any error using this software.
> 
> Effective tracking and project financial planning and risk management product with various responsive features and the permission management capability is great.

-----

### "Satisfactory" — 3.0/5

> **NIKHIL** | *17 octobre 2017* | Biotechnologie | Taux de recommandation : 7.0/10
> 
> **Avantages**: I liked the P6 in particular as a Scheduling Software as it allows me to perform additional tasks which are unable on Microsoft Project. I like the part where you can bunch a group of activities to be performed by a particular resource using a unique identification code and it can be useful on big projects where a resource just needs to know his part in the overall schedule
> 
> **Inconvénients**: I was not happy with the software for particularly smaller projects and since there are licensing fees associated with the product it does not make sense to use it for smaller projects. Microsoft Project is a pretty decent scheduling software on its own to carry out projects and it also saves us the trouble of training people on the new software
> 
> I was able to use the P6 software on multi million dollar projects and it played a great role in improving the efficiency of the work and keeping track of critical deliverables

-----

### "Project Scheduling Software that works" — 4.0/5

> **Muhammed Anshad** | *12 avril 2020* | Logiciels de construction | Taux de recommandation : 8.0/10
> 
> **Avantages**: Oracle Primavera P6 is one of the best Project Scheduling tool that works on Critical path Method. I like the following features the most&#10;- Vast integration capability with Web, EPPM, Primavera Mobile and other oracle tools&#10;- Ability to generate large amount of data especially in the form of spreadsheet&#10;- Fully functional Earned Value Management
> 
> **Inconvénients**: The software UI is old style and the options are not properly organised. There are some software bugs that are still persistent and oracle has been very slow in debugging them.
> 
> No doubt, it's the best project scheduling tool that is available for construction industry till date. Overall I would prefer this software over any other similar software for its pros mentioned.

-----

### "Best tool to manage portfolio" — 5.0/5

> **Swapnil** | *1 décembre 2023* | Pétrole et énergies | Taux de recommandation : 9.0/10
> 
> **Avantages**: There is a option to view n number of projects at a time with progress comparison
> 
> **Inconvénients**: Initial loading takes a bot longer time.

-----

Page : 1/9\
Suivant: [Page suivante](https://www.capterra.lu/software/181380/oracle-primavera?page=2)

## Liens

- [Afficher sur Capterra](https://www.capterra.lu/software/181380/oracle-primavera)

## Cette page est disponible dans les langues suivantes.

| Langue | URL |
| de | <https://www.capterra.com.de/software/181380/oracle-primavera> |
| de-AT | <https://www.capterra.at/software/181380/oracle-primavera> |
| de-CH | <https://www.capterra.ch/software/181380/oracle-primavera> |
| en | <https://www.capterra.com/p/145503/Oracle-Primavera/> |
| en-AE | <https://www.capterra.ae/software/181380/oracle-primavera> |
| en-AU | <https://www.capterra.com.au/software/181380/oracle-primavera> |
| en-CA | <https://www.capterra.ca/software/181380/oracle-primavera> |
| en-GB | <https://www.capterra.co.uk/software/181380/oracle-primavera> |
| en-IE | <https://www.capterra.ie/software/181380/oracle-primavera> |
| en-IL | <https://www.capterra.co.il/software/181380/oracle-primavera> |
| en-IN | <https://www.capterra.in/software/181380/oracle-primavera> |
| en-NZ | <https://www.capterra.co.nz/software/181380/oracle-primavera> |
| en-SG | <https://www.capterra.com.sg/software/181380/oracle-primavera> |
| en-ZA | <https://www.capterra.co.za/software/181380/oracle-primavera> |
| es | <https://www.capterra.es/software/181380/oracle-primavera> |
| es-AR | <https://www.capterra.com.ar/software/181380/oracle-primavera> |
| es-CL | <https://www.capterra.cl/software/181380/oracle-primavera> |
| es-CO | <https://www.capterra.co/software/181380/oracle-primavera> |
| es-CR | <https://www.capterra.co.cr/software/181380/oracle-primavera> |
| es-DO | <https://www.capterra.do/software/181380/oracle-primavera> |
| es-EC | <https://www.capterra.ec/software/181380/oracle-primavera> |
| es-MX | <https://www.capterra.mx/software/181380/oracle-primavera> |
| es-PA | <https://www.capterra.com.pa/software/181380/oracle-primavera> |
| es-PE | <https://www.capterra.pe/software/181380/oracle-primavera> |
| fr | <https://www.capterra.fr/software/181380/oracle-primavera> |
| fr-BE | <https://fr.capterra.be/software/181380/oracle-primavera> |
| fr-CA | <https://fr.capterra.ca/software/181380/oracle-primavera> |
| fr-LU | <https://www.capterra.lu/software/181380/oracle-primavera> |
| it | <https://www.capterra.it/software/181380/oracle-primavera> |
| nl | <https://www.capterra.nl/software/181380/oracle-primavera> |
| nl-BE | <https://www.capterra.be/software/181380/oracle-primavera> |
| pt | <https://www.capterra.com.br/software/181380/oracle-primavera> |
| pt-PT | <https://www.capterra.pt/software/181380/oracle-primavera> |
| sv | <https://www.capterra.se/software/181380/oracle-primavera> |

-----

## Données structurées

<script type="application/ld+json">
  {"@context":"https://schema.org","@graph":[{"name":null,"address":{"@type":"PostalAddress","addressLocality":null,"addressRegion":null,"postalCode":null,"streetAddress":null},"description":"Capterra Luxembourg aide des millions de professionnels à trouver le bon logiciel. Découvrez les avis, les notes et les listes exhaustives d'outils informatiques.","email":"info@capterra.lu","url":"https://www.capterra.lu/","logo":"https://dm-localsites-assets-prod.imgix.net/images/capterra/logo-a9b3b18653bd44e574e5108c22ab4d3c.svg","@id":"https://www.capterra.lu/#organization","@type":"Organization","parentOrganization":"G2.com, Inc.","sameAs":["https://twitter.com/capterra","https://www.facebook.com/Capterra/","https://www.linkedin.com/company/capterra","https://www.instagram.com/capterra/","https://www.youtube.com/user/CapterraTV"]},{"name":"Oracle Primavera Cloud","description":"La suite logicielle Oracle Primavera propose des applications sur site et sur le cloud puissantes, robustes et faciles à utiliser pour la hiérarchisation, la planification, la gestion et la réalisation de programmes, de portefeuilles et de projets réussis au niveau mondial.\n\nQu'il s'agisse de planification de projets, de contrôle des coûts et des projets, de gestion des documents ou de portefeuille, d'analytique ou encore d'analyse de risque, elle permet aux constructeurs, aux ingénieurs et aux propriétaires de projet de secteurs à forte intensité d'actifs d'améliorer les résultats tout au long du cycle de vie du projet.","image":"https://gdm-catalog-fmapi-prod.imgix.net/ProductScreenshot/435a05d1-defd-4a40-961f-594ebcb0f3cd.png","url":"https://www.capterra.lu/software/181380/oracle-primavera","@id":"https://www.capterra.lu/software/181380/oracle-primavera#software","@type":"SoftwareApplication","applicationCategory":"BusinessApplication","publisher":{"@id":"https://www.capterra.lu/#organization"},"aggregateRating":{"@type":"AggregateRating","bestRating":5,"ratingCount":182,"ratingValue":4.4},"offers":{"price":"100","@type":"Offer","priceCurrency":"USD"},"operatingSystem":"Cloud, Windows on premise, Linux on premise"},{"@id":"https://www.capterra.lu/software/181380/oracle-primavera#faqs","@type":"FAQPage","mainEntity":[{"name":"Qui utilise Oracle Primavera Cloud ?","@type":"Question","acceptedAnswer":{"text":"Les secteurs de l'ingénierie et de la construction,de l'énergie et des ressources,le secteur public.Manufacture","@type":"Answer"}}]},{"@id":"https://www.capterra.lu/software/181380/oracle-primavera#breadcrumblist","@type":"BreadcrumbList","itemListElement":[{"name":"Accueil","position":1,"item":"/","@type":"ListItem"},{"name":"Logiciels de construction","position":2,"item":"/directory/30057/construction-management/software","@type":"ListItem"},{"name":"Oracle Primavera Cloud","position":3,"item":"/software/181380/oracle-primavera","@type":"ListItem"}]}]}
</script>
